Client: City of Port Lincoln
Services: Evaluation, FacilitiesConsultants: Phillip Gray
Location: Level One, Civic Centre, 60 Tasman Terrace, Port Lincoln South Australia 5606, Australia
Completion: August 14, 2014
Partners & Stakeholders:
Frank Siow & Associates
The City of Port Lincoln commissioned a consortium led by SGL to prepare a feasibility study and business case comparing redeveloping an existing centre with constructing a new aquatic centre. The study included an assessment of the existing facility and compared the capital and operating costs with a new facility at another location.
The feasibility study was conducted in three phases with the following tasks:
Phase 1: Project Inception
1 Project Inception Meeting
2 Document Review
Phase 2: Selection of Preferred Site
1 Potential Site Selection
2 Individual Site Assessments
3 Site Assessment Report
4 Presentation to Council
Phase 3: Feasibility Assessment
1 Key Stakeholder Interviews – both sites
2 Structural Audit of Existing Centre
3 Review of Environmentally Sustainable P&E
4 Review of Pool Design
5 Benchmarking
6 Population/Participation Analysis
7 Design Brief
8 Demand Assessment Report
9 Precinct Plans
10 Concept Master Plan
11 Cost Estimate
12 Management Options
13 Operational Analysis
14 Whole of Life Costs
15 Final Feasibility Study
The feasibility study was conducted in three phases with the following tasks:
Phase 1: Project Inception
1 Project Inception Meeting
2 Document Review
Phase 2: Selection of Preferred Site
1 Potential Site Selection
2 Individual Site Assessments
3 Site Assessment Report
4 Presentation to Council
Phase 3: Feasibility Assessment
1 Key Stakeholder Interviews – both sites
2 Structural Audit of Existing Centre
3 Review of Environmentally Sustainable P&E
4 Review of Pool Design
5 Benchmarking
6 Population/Participation Analysis
7 Design Brief
8 Demand Assessment Report
9 Precinct Plans
10 Concept Master Plan
11 Cost Estimate
12 Management Options
13 Operational Analysis
14 Whole of Life Costs
Final Feasibility Study