Port Lincoln Aquatic Centre Feasibility Study

Summary

Client: City of Port Lincoln

Services: Evaluation, Facilities

Consultants: Phillip Gray

Location: Level One, Civic Centre, 60 Tasman Terrace, Port Lincoln South Australia 5606, Australia

Completion: August 14, 2014

Partners & Stakeholders: Frank Siow & Associates

Synopsis

The City of Port Lincoln commissioned a consortium led by SGL to prepare a feasibility study and business case comparing redeveloping an existing centre with constructing a new aquatic centre. The study included an assessment of the existing facility and compared the capital and operating costs with a new facility at another location.

Features

The feasibility study was conducted in three phases with the following tasks:

 

Phase 1: Project Inception

1      Project Inception Meeting

2      Document Review

Phase 2: Selection of Preferred Site

1      Potential Site Selection

2      Individual Site Assessments

3      Site Assessment Report

4      Presentation to Council

Phase 3: Feasibility Assessment

1      Key Stakeholder Interviews – both sites

2      Structural Audit of Existing Centre

3      Review of Environmentally Sustainable P&E

4      Review of Pool Design

5      Benchmarking

6      Population/Participation Analysis

7      Design Brief

8      Demand Assessment Report

9      Precinct Plans

10    Concept Master Plan

11    Cost Estimate

12    Management Options

13    Operational Analysis 

14    Whole of Life Costs

 

15    Final Feasibility Study 

The feasibility study was conducted in three phases with the following tasks:

 

Phase 1: Project Inception

1      Project Inception Meeting

2      Document Review

Phase 2: Selection of Preferred Site

1      Potential Site Selection

2      Individual Site Assessments

3      Site Assessment Report

4      Presentation to Council

Phase 3: Feasibility Assessment

1      Key Stakeholder Interviews – both sites

2      Structural Audit of Existing Centre

3      Review of Environmentally Sustainable P&E

4      Review of Pool Design

5      Benchmarking

6      Population/Participation Analysis

7      Design Brief

8      Demand Assessment Report

9      Precinct Plans

10    Concept Master Plan

11    Cost Estimate

12    Management Options

13    Operational Analysis 

14    Whole of Life Costs

Final Feasibility Study